Trails / From Work Item to PR

From Work Item to PR

6 parts ~93 min total engineering product operations
Start the trail →

Parts

  1. Part 1

    Where the Work Lives

    Coordinating between GitHub and beads, for the people doing the planning and the people doing the building

    16 min engineering product operations
  2. Part 2

    Beads, the Backbone

    The CLI issue tracker that gives an agent a memory that survives the next compaction

    18 min engineering product
  3. Part 3

    Timbers, the Ledger

    The second ledger every commit needs — one line of what, why, and how, searchable forever

    12 min engineering product
  4. Part 4

    Just: One Place to Discover

    The discovery surface that turns project incantations into a known place humans and agents both look first

    14 min engineering product operations
  5. Part 5

    Working in Parallel (Mostly)

    Worktrees, the bd worktree warning, and the one Docker constraint we have not solved yet

    14 min engineering
  6. Part 6

    From Plan to Pull Request: A Day on Strike

    One realistic feature, end to end, with every prior cairn put to work

    19 min engineering product